RHESSys Workflow for Ellerbe Creek at Club Boulevard near to Durham, NC


Authors:
Owners: Lorne Leonard
Type: Resource
Storage: The size of this resource is 15.3 KB
Created: Jan 25, 2017 at 7:45 p.m.
Last updated: Jan 25, 2017 at 7:50 p.m.
Citation: See how to cite this resource
Sharing Status: Public
Views: 2289
Downloads: 285
+1 Votes: Be the first one to 
 this.
Comments: No comments (yet)

Abstract

RHESSysWorkflows provides a series of Python tools for performing [RHESSys](https://github.com/RHESSys/RHESSys) data preparation workflows. These tools build on the workflow system defined by [EcohydroLib](https://github.com/selimnairb/EcohydroLib) and [RHESSysWorkflows](https://github.com/selimnairb/RHESSysWorkflows).

This notebook assumes general steps 1 to 13 are an existing resource within HydroShare.

This notebook focuses on general steps 14 to 19 using the Ellerbe Creek catchment
14 Generate template
15 Create world
16 Create flow table
17 Initializing vegetation carbon and nitrogen stores
18 Creating a RHESSys TEC file
19 Running RHESSys models

Users interested in seeing step outputs, remove **output = ** from the command line.
Note, some output lengths are very long and this notebook will become large in disk size.

Content

    No files to display.

How to Cite

Leonard, L., B. Miles, L. Band, L. Lin, J. Duncan, C. Scaife, J. P. Lovette (2017). RHESSys Workflow for Ellerbe Creek at Club Boulevard near to Durham, NC, HydroShare, http://www.hydroshare.org/resource/e89b8b7d3eba4547ba103ed1cd8ecf64

This resource is shared under the Creative Commons Attribution CC BY.

http://creativecommons.org/licenses/by/4.0/
CC-BY

Comments

There are currently no comments

New Comment

required